DISCONTINUED
The modern railway installation of Period VI.
Present-day version of the tower controlling the position of signals, points and track locks through electronic channels. It is gradually taking the place of mechanical signal towers.
Clinker-built construction with the associated antenna masts ensuring the transmission of signals, and a decoration sheet.
This building kit contains: 32 single parts in 3 colours, 1 decoration and 1 construction instruction.
119 x 40 x 38 mm.
On Watchlists: 1
DISCONTINUED